Commercial • Greeley

Industrial facility

Through-fastened metal panels over new insulation, with box gutters and downspouts sized for roof area.

The manufacturing plant’s original roof leaked at skylight clusters and along the north gutter where ice had bent hangers. Operations required a solution before Q4 production peaks, so we prioritized weekend panel removal and weekday interior protection only where absolutely necessary.

We specified a structural metal panel over new blanket and rigid insulation to meet updated energy code, replaced skylight curbs entirely, and upsized box gutters with internal bracing for snow load.

Safety & production constraints

  • Fall-arrest anchors labeled for in-house PM use post job
  • No hot work inside odor-sensitive production line days
  • Forklift escort for boom lift moves on active dock
  • Daily LOTO coordination with plant electrician

Major work packages

  1. Demo: Remove panels, wet blanket, rusted purlin clips.
  2. Structure: Sister select purlins; replace skylight bucks.
  3. Envelope: Insulation, vapor careful at freezer wall junction.
  4. Finish: Panels, gutters, downspouts, touch-up, warranty.

Equipment & crew (summary)

Equipment summary
Resource Days on site Role
60-ft boom 18 Panel + gutter
Crane (weekends) 4 Bundle drops
Scrap dumpsters Rolling 30 yd swaps
Crew peak 12 people Split shifts Sat

Before & after

Leaking skylight clusters and bent gutter hangers gave way to new structural panels, insulation, and oversized box gutters.

After: new metal roof and wall panels
Before: failing low-slope and skylight leaks
Before After

Move the slider left or right to reveal more of the “before” or “after” side.

Click any thumbnail to open the full-screen album. Use the arrows or your keyboard to browse every project photo.

Plant managers

Industrial reviews focus on weekend discipline, interior drip prevention, and whether the crew respected red-tag zones.

“Weekend noise was less than we feared. Monday lines started on time.”

— Plant superintendent

“Gutters finally handle spring melt — no more ice dams on the dock.”

— Maintenance chief

“Closeout included anchor map PDF — maintenance team uses it monthly.”

— EHS coordinator
4.98

Google average

850+ reviews statewide

Read more reviews

Next step

Industrial roof assessment

We'll work around production windows and return a bid with weekend vs weekday pricing options.

Book consultation Call office
Rough calculator

Rough budget calculator

Structural metal buildings often land between metal and commercial rates — try both in the dropdown.